• facebook
  • twitter
  • instagram
  • youtube
  • android
  • apple
Public Tender Advertisement: Al Dhafra Regional Surface Transport Master Plan
Thursday, Aug 22, 2019
Al Dhafra STMP Update
 
 
The Abu Dhabi Department of Transport (DoT) is proposing to undertake a strategic transportation master planning study - the Al Dhafra Region Surface Transport Master Plan Study. 
 
 
The study’s key focus is on developing a new single Regional STMP covering the entire Al Dhafra Region and which updates and   supersedes the existing Al Gharbia Surface Transport Master Plan (2012) and the Al Gharbia City Transport Master Plans (2014).
 
 
The Department is seeking proposals from Bidders or consortiums of Bidders with high levels of international and local expertise.  The successful Bidder is expected to be highly experienced in the following areas to be capable of undertaking the study:
 
  • Study leadership including skills in consultation, communication, presentations, and workshop facilitation to stakeholders and decision makers;
  • Strategic transport planning of transport policy and infrastructure master plans for multi-modal surface transport systems, including integration with the aviation sector;
  • Sustainable and integrated transport and land use planning;
  • Multi-modal transport system alternatives analysis and assessment
  • Travel demand modelling;
  • Project feasibility, concept design, costing, and economic assessment at a strategy level;
  • Implementation programme development;
The entire project shall be completed in 10 months, and be carried out according to the following core study tasks:
  • Task 1: Project Inception
  • Task 2: Issues and Solutions
  • Task 3: Assessment of Alternatives
  • Task 4: Assessment of Preferred Option
  • Task 5: Preparation of Master Plan
  • Task 6: Preparation of Budget and Funding Plan
  • Task 7: Safeguarding
  • Task 8: Launch Preparation
Two tasks are included as additional options, which will be added to the core study tasks in an alternative bid:
  • Task 9: Immediate Measures
  • Task 10: Technical support
 




Share